Clay Gould Ball Park

Project Info

  • Client: Clay Gould Ball Park
  • Completion Date: March 2022

Areas of Focus

Digital Resources provided the new broadcast design for the baseball and softball broadcast system. The stadium was upgraded with fiber and interface boxes from the outfield, infield into the control room. The control room layout is focused on sports broadcasting with emphasis on multiple show footprint. The control room was designed for new Forecast console and control space. The system expectation included some standard requirements which included 4K capable studio cameras, replay system, high level graphics, digital intercom and complete fiber interfaces. The broadcast feeds ESPN and in-house broadcast demands.